Search
Now showing items 1-2 of 2
Improving the performance of an existing air-cooled binary geothermal power plant: A case study
(SEP)
An existing air-cooled binary geothermal pow er plans in northern Nevada is studied. The current performance of the plant is analyzed with an emphasis on the effects of seasonal climate changes. Two potential sites have ...
Retrofitting a geothermal power plant to optimize performance: A case study
(DEC)
Performance evaluation of a 12.8-MW single-flash design geothermal power plant in Northern Nevada is conducted using actual plant operating data, and potential improvement sites are identified The unused geothermal brine ...