Basit öğe kaydını göster

dc.contributor.authorEdis, EB; Kuru, B
dc.date.accessioned2020-07-01T08:26:08Z
dc.date.available2020-07-01T08:26:08Z
dc.date.issued2017
dc.identifier.urihttp://hdl.handle.net/20.500.12481/5489
dc.description.abstractThis study deals with a job allocation and scheduling problem of batch processing ovens belonging to a factory that manufactures welding electrodes. Each electrode type may not be heated on all of the ovens. Besides, there exists a priority order of ovens for each electrode type. The other inputs are; work order amounts of electrodes, the ready times, heating times, cooling down times, and the capacity of each oven with respect to the electrode types. The work orders with the same heating time may be heated simultaneously without exceeding the oven capacity. For the defined problem, an integer programming model is developed. The objective function is to assign the work orders to the preferred ovens as possible and to maximize the utilization rates of ovens. The model determines which work order will be heated on which machine and in which time interval. The model results are launched for two different work order sets. Finally, by discussing the results, the applicability of the model is demonstrated.
dc.titleJob allocation and scheduling of batch processing ovens: An integer programming model
dc.title.alternativePAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI
dc.identifier.DOI-ID10.5505/pajes.2016.53315
dc.identifier.volume23
dc.identifier.issue1
dc.identifier.startpage81
dc.identifier.endpage87
dc.identifier.issn/e-issn1300-7009
dc.identifier.issn/e-issn2147-5881


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster